Creating a project / request job report and track time

  1. Click on the “Projects” link at the home page then click on the project.Click on the "Projects" link at the home page then click on the project.
  2. Click on the “Add Report” link.Click on the "Add Report" link.
  3. Populate the “Description” field with details on the job report; this field is required.Populate the "Description" field with details on the job report; this field is required.
  4. Click on the “Date” field to set when the work was performed.
  5. To track time — populate the “Time Spent” field with the number of hours. It can accept decimal format (e.g. 2.5) or time format (e.g. 2:30).
  6. Files such as pictures and documents can be attached to the job report. Click on the “Select Files” box, and choose the file from the window that comes up. Add a description for the file as needed and click on the “Add” button.

The job report is created. To change the job report click on the “Edit” link for it.